BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20170308T140000Z
DTEND:20170308T160000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Sub Contractors Needed - Water Treatment Project at Cherry Point
DESCRIPTION:Meet with a prime contractor\, find out about the contract and get a leg up on the competition.\n\n\n\nGarney Federal has been recently awarded a $49M water treatment project at Cherry Point for the US Navy.  This $49 Million project constructs a multi-story reinforced concrete masonry unit building with pile foundation\, reinforced concrete slab and floors\, structural steel framing\, brick masonry exterior\, steel trusses\, and standing seam metal roof.  The new building will house the chemical feed systems\, high service pumps\, multimedia pressure filters\, membrane filtration skids\, storage tanks\, generators\, post treatment chemical feed systems\, administrative space\, laboratory space and a communication room. \n\n\n\nSub-Contractors Needed:\n\nSite Work\, Utilities\, Concrete Construction\, Building\, Landscaping\, Traffic Control and Material Supplies
X-ALT-DESC;FMTTYPE=text/html:Meet with a prime contractor\, find out about the contract and get a leg up on the competition.<br />\n<br />\nGarney Federal has been recently awarded a $49M water treatment project at Cherry Point for the US Navy.&nbsp\; This $49 Million project constructs a multi-story reinforced concrete masonry unit building with pile foundation\, reinforced concrete slab and floors\, structural steel framing\, brick masonry exterior\, steel trusses\, and standing seam metal roof.&nbsp\; The new building will house the chemical feed systems\, high service pumps\, multimedia pressure filters\, membrane filtration skids\, storage tanks\, generators\, post treatment chemical feed systems\, administrative space\, laboratory space and a communication room.&nbsp\;<br />\n<br />\nSub-Contractors Needed:<br />\nSite Work\, Utilities\, Concrete Construction\, Building\, Landscaping\, Traffic Control and Material Supplies
LOCATION:New Bern Area Chamber of Commerce 316 S. Front Street Downtown\, New Bern
UID:e.2120.2777
SEQUENCE:3
DTSTAMP:20260511T003731Z
URL:https://business.newbernchamber.com/events/details/sub-contractors-needed-water-treatment-project-at-cherry-point-2777
END:VEVENT

END:VCALENDAR
